Planning Quality

This page answers the hardest evidence question on the site: did Verdify make useful greenhouse decisions, or did it merely create plans?

Planning quality is not a single number. It is the relationship between:

  • what the forecast said would happen
  • what the planner decided to do
  • what the greenhouse actually experienced
  • how much stress, water, and cost remained afterward
  • what lessons were extracted for the next cycle

For the exact parameters the planner can change, see AI-Writable Tunables.

Open the live Planning Quality dashboardGrafana read-only view

Use this for the continuously refreshed panels. The static snapshot below is the crawler-friendly proof layer.

Current scorecard

Static public API snapshot: 2026-05-09 13:19 MDT. Source: evidence snapshot JSON and scorecard API. These values are crawler-friendly receipts; use the live dashboard link above for continuously refreshed panels.

57.6

Today's planner score

52.7%

Both-axis compliance

83.2%

Temperature compliance

61.3%

VPD compliance

7.33h

Stress-axis hours

May 8

Last validated plan

Last validated planiris-20260508-0552

Validated 2026-05-09 05:52 MDT with outcome score 4.

Latest plan statusiris-20260509-0551 · awaiting outcome

Written 2026-05-09 05:54 MDT; age 7.4h at snapshot time.

Stress breakdownheat 1.38h · cold 0.83h · VPD-high 1.97h · VPD-low 3.15h

Total stress-axis hours can exceed wall-clock hours because temperature and VPD are independent stress axes.

Latest lesson#99 · humidity · high confidence · validated 5x

Mist/fog suppression alone can preserve dew-point safety but leave VPD below band for most of the day. When dp margin is safe, pair mist suppression with a more active dehumidification/ventilation posture and stable dwell timing rather than simply raising mist thresholds all day.

Did the plan improve the outcome?

What to inspect: score trend, both-axis compliance, and stress-axis hours over the last 30 days.

The compliance panel is percent only: temperature compliance, VPD compliance, and total compliance when both axes are inside band.

The stress panel is time only: temperature stress hours, VPD stress hours, and total stress hours. Total stress can exceed 24 hours because temperature and VPD are independent stress axes.

Forecast, plan, actual

What to inspect: forecast pressure, planned bands, and the actual greenhouse response across the current planning window.

These panels are the direct decision story. The forecast is the external pressure. The planned bands are the AI posture. The actual indoor line is what the plants experienced.

The planned posture maps back to bounded parameters in AI-Writable Tunables.

Compliance and accuracy

What to inspect: waypoint compliance and forecast/plan accuracy grouped by day.

Compliance is waypoint-level: planned setpoints compared against actual hourly extremes. Accuracy groups those checks by day so the pattern is easier to inspect.

Tradeoffs

What to inspect: whether water and cost increases correspond to meaningful stress reduction.

The goal is not simply to minimize cost or water. The goal is to spend them when they buy meaningful stress reduction.

Journal and lessons

What to inspect: plan outcomes, extracted lessons, and whether repeated lessons have become useful operating constraints.

Open full dashboard ↗