Compliance

Control system audit and validation. The question is always: is the controller doing what it’s supposed to, and are the timing constraints being respected?

Controller State History

The full state machine timeline β€” every transition the controller made.

Setpoint Tracking

Temperature and VPD plotted against their configured setpoint bands. Deviations reveal control lag or capacity limits.

Economiser Performance

Enthalpy delta between indoor and outdoor air, and economiser (vent) activity timeline.

Timing Constraints

Minimum on-time and off-time configurations β€” ensuring equipment isn’t short-cycling.

Plan Accuracy & State Durations

How well actual conditions matched the plan, and total time spent in each state.

Forecast Inputs

The outdoor temperature and solar radiation forecasts feeding the predictive control loop.


Key Results: Setpoint compliance >90%, short-cycle violations 0, plan accuracy >85%, economiser utilization tracked.